Custom transformer engineering · 20 W to 20 kW info@establecorp.com Engineering review available
Copper winding being positioned on a toroidal transformer core at a manufacturing partner
ENGINEERED MAGNETICS & POWER

Transformers built for the application.

Custom transformers and power-conversion products for equipment manufacturers. From 20 W prototypes to 20 kW production builds, specified around electrical, mechanical and compliance requirements.

WINDING / MANUFACTURING PARTNER 20 W–20 kW STANDARD · MODIFIED · CUSTOM SCROLL TO ENGINEER THE BUILD ↓

A transformer should fit the system, not force the system to fit the catalogue.

ESTABLE matches equipment requirements to the right transformer or power-conversion product. Each project starts with the application and moves through an approved drawing, sample, test plan and controlled production release.

PRODUCT SYSTEMS

Eight product groups.
One point of technical responsibility.

From 20 W compact transformers to large equipment assemblies, each product is selected as part of the complete power system.

POWER CONVERSION

Voltage, desktop and application power

Voltage converters, autotransformers, AC desktop units, dimming-glass supplies and heating controls complete the power system.

Explore power conversion
ESTABLE / ENGINEERING FILEET-CUSTOMER-001
Transformer requirement review
INPUTWINDINGSENVIRONMENTAPPROVAL
ApplicationControl panel / automation InputVoltage · frequency · variation OutputWinding list · load · duty MechanicalEnvelope · mounting · access ComplianceFinal device · standards · files
REQUIREMENT
CAPTURE
FROM REQUIREMENT TO EVIDENCE

Every critical assumption has a place in the file.

The specification, drawing, sample and production record remain connected. That makes changes visible and repeat orders easier to control.

  1. 01
    Review

    We organize the drawing, nameplate, application and missing data.

  2. 02
    Specify

    The electrical and mechanical route is confirmed by an engineer.

  3. 03
    Sample

    A paid sample is checked for form, fit and function.

  4. 04
    Produce

    Approved configuration, test records and batch documentation.

See how a project runs
MANUFACTURING EVIDENCE

Look beyond the render.

Winding, encapsulation and dielectric testing are visible parts of the production route. Manufacturing is carried out by qualified partner facilities.

Copper winding being positioned on a toroidal transformer core at a manufacturing partner
01 / WINDINGConductor placement and insulation build.
Rack of potted toroidal transformers prepared for production
02 / ENCAPSULATIONPotted parts moving through production.
Production dielectric test of a transformer at a manufacturing partner
03 / TESTDielectric verification on the test bench.
ENGINEERING POSITION
Do not hide the difficult questions. Resolve them before the build.
Applicationdefines the starting point
Evidencesupports the specification
Approvallocks the production baseline
START WITH WHAT YOU HAVE

A drawing is useful.
A nameplate is enough to begin.

Your choice can be changed at any time through “Cookie settings” in the footer. Essential technologies are required for site operation.